  AN APPROACH TO LOCATE AN IN PIT CRUSHER IN OPEN PIT MINES
 
M. Rahmanpour, M. Osanloo, N. Adibee and M. AkbarpourShirazi
 
( Received: December 30, 2013 – Accepted: May 22, 2014 )
 
 

Abstract    Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem. In selecting the optimum location, two factors are considered. First, the overall haulage cost is minimized, and second, the location is chosen such that it is not located inside the mining area, and crusher site is fixed through a period of at least one year. Application of single hub problem is quite effective in determining the location of the in pit crusher. The method is applied in Sarcheshmeh copper mine, to determine the optimum location of the in pit crushing and conveying system.

 

Keywords    Open Pit Mining, In Pit Crushing and Conveying, Hub Location Problem

 

چکیده    هزينه حمل ونقل، مهمترين بخش از هزينه‌های سرمايه‌ای و عملياتی معادن روباز بزرگ را تشکيل می‌دهد. با توجه به روند افزايشی ميزان توليد معادن روباز و نيز عميق‌تر شدن اين معادن، پيش‌بينی مي‌شود استفاده از سيستم سنگ‌شکن درون پيت و حمل مواد با نوار نقاله به عنوان يکی از روش‌های حمل و نقل در معادن روباز گسترش يابد. با توجه به اينکه اين سيستم در قياس با سيستم متداول شاول و کاميون، کم هزينه‌تر بوده و دارای قابليت اطمينان بالاتری است، از اين روی مورد توجه معدن‌کاران نيز قرار گرفته است. در اين مقاله نحوه تعيين موقعيت مناسب برای استقرار سيستم سنگ‌شکن درون پيت به صورت يک مساله هاب مدل‌سازی شده است. در تعيين موقعيت بهينه سنگ‌شکن درون پيت، دو عامل اصلی مورد توجه قرار گرفته است. اول اينکه، کل هزينه حمل که تابعی از طول مسير است به حداقل برسد، و دوم اينکه موقعيت انتخاب شده برای استقرار سنگ‌شکن در داخل محدوده استخراجی قرار نداشته باشد و موقعيت سنگ‌شکن برای يک بازه حداقل يک ساله تغيير نکند. اين روش برای تعيين محل استقرار سيستم سنگ‌شکن درون پيت در معدن مس سرچشمه مورد بررسی قرار گرفته است

References   

 

1.        Frizzell, E.M. and Martin, T.W., "In-pit crushing and conveying", Mining engineering handbook. Hartman et al., Eds., Society for Mining, Metallurgy, and Exploration,  Vol., No., (1992), 1343-1351. Hartman, H.L. and Britton, S.G., "Sme mining engineering handbook, Society for Mining, Metallurgy, and Exploration,  Vol. 2, (1992).

2.        Meng, C., Nageshwaraniyer, S.S., Maghsoudi, A., Son, Y.-J. and Dessureault, S., "Data-driven modeling and simulation framework for material handling systems in coal mines", Computers & Industrial Engineering,  Vol. 64, No. 3, (2013), 766-779.

3.        Topal, E. and Ramazan, S., "Mining truck scheduling with stochastic maintenance cost", Journal of Coal Science and Engineering (China),  Vol. 18, No. 3, (2012), 313-319.

4.        Peng, S. and Vayenas, N., "Reliability analysis of underground mining equipment using genetic algorithms: A case study of two mine hoists", Journal of Quality in Maintenance Engineering,  Vol. 20, No. 1, (2014), 3-3.

5.        Mena, R., Zio, E., Kristjanpoller, F. and Arata, A., "Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constraints", International Journal of Mining Science and Technology,  Vol. 23, No. 1, (2013), 113-119.

6.        Souza, M.J., Coelho, I.M., Ribas, S., Santos, H.G. and Merschmann, L.H.d.C., "A hybrid heuristic algorithm for the open-pit-mining operational planning problem", European Journal of Operational Research,  Vol. 207, No. 2, (2010), 1041-1051.

7.        Liu, S.Q. and Kozan, E., "An interactive planning and scheduling framework for optimizing pits-to-crushers operations", Industrial Engineering & Management Systems,  Vol. 11, No. 1, (2012), 94-102.

8.        Londońo, J., Knights, P. and Kizil, M., "Modelling of in-pit crusher conveyor alternatives", Mining Technology,  Vol. 122, No. 4, (2013), 193-199.

9.        ROBERTSON, J., "In-pit crusher cuts truck haul", Rock Products,  Vol. 87, No. 8, (1984), 40-42.

10.     Sturgul, J.R., "How to determine the optimum location of in-pit movable crushers", Geotechnical and Geological Engineering,  Vol. 5, No. 2, (1987), 143-148.

11.     Konak, G., Onur, A. and Karakus, D., "Selection of the optimum in-pit crusher location for an aggregate producer", Journal of the South African Institute of Mining and Metallurgy,  Vol. 107, No. 3, (2007), 161-166.

12.     Tutton, D. and Streck, W., "The application of mobile in pit crushing and conveying in large, hard rock open pit mines", in Mining Magazine, Canada. (2009).

13.     Li, S.-X. and Knights, P., "Integration of real options into short-term mine planning and production scheduling", Mining Science and Technology (China),  Vol. 19, No. 5, (2009), 674-678.

14.     Atchison, T. and Morrison, D., "In-pit crushing and conveying bench operations", in Iron ore conference, Perth. (2011).

15.     Osanloo, M., "Future challenges in mining division, are we ready for these challenges? Do we have solid educational program?", Cuprum: Czasopismo Naukowo-techniczne Górnictwa Rud, (2012), 61-70.

16.     Ekipman, A.O.M.Ğ.O., Bir, S.İ., Sistemi, K.D. and Prosesi, A.H., "A decision support system for optimal equipment selection in open pit mining: Analytical hierarchy process", Istanbul University, Mining Engineering Department,  Vol. 16, No. 2, (2003), 1-11.

17.     Bascetin, A., Oztas, O. and Kanli, A., "Eqs: A computer software using fuzzy logic for equipment selection in mining engineering", Journal-South African Institute of Mining and Metallurgy,  Vol. 106, No. 1, (2006), 63-70.

18.     Aghajani Bazzazi, A., Osanloo, M. and Karimi, B., "Deriving preference order of open pit mines equipment through madm methods: Application of modified vikor method", Expert Systems with Applications,  Vol. 38, No. 3, (2011), 2550-2556.

19.     Tavakkoli-Moghaddam, R., Heydar, M. and Mousavi, S., "An integrated ahp-vikor methodology for plant location selection", International Journal of Engineering-Transactions B: Applications,  Vol. 24, No. 2, (2011), 127.

20.     Setak, M., Karimi, H. and Rastani, S., "Designing incomplete hub location-routing network in urban transportation problem", International Journal of Engineering-Transactions C: Aspects,  Vol. 26, No. 9, (2013), 997.

21.     Ghodratnama, A., Tavakkoli-Moghaddam, R. and Baboli, A., "Comparing three proposed meta-heuristics to solve a new p-hub location-allocation problem", International Journal of Engineering-Transactions C: Aspects,  Vol. 26, No. 9, (2013), 1043.

22.     Toh, R.S. and Higgins, R.G., "The impact of hub and spoke network centralization and route monopoly on domestic airline profitability", Transportation Journal,  (1985), 16-27.

23.     Alumur, S. and Kara, B.Y., "Network hub location problems: The state of the art", European Journal of Operational Research,  Vol. 190, No. 1, (2008), 1-21.

24.     Daskin, M.S., "Network and discrete location: Models, algorithms, and applications, John Wiley & Sons,  (2011).

25.     Hekmatfar, M. and Pishvaee, M., Hub location problem, in Facility location. Springer, (2009) 243-270.

26.     Naeem, M., "Using genetic algorithms for the single allocation hub location problem",  (2010).

27.     Alumur, S.A., Nickel, S. and Saldanha-da-Gama, F., "Hub location under uncertainty", Transportation Research Part B: Methodological,  Vol. 46, No. 4, (2012), 529-543.

28.     Tavakkoli-Moghaddama, R., Gholipour-Kananib, Y. and Shahramifarc, M., "A multi-objective imperialist competitive algorithm for a capacitated single-allocation hub location problem", International Journal of Engineering-Transactions C: Aspects,  Vol. 26, No. 6, (2013), 605-612

29.     Saaty, T.L., "Exploring the interface between hierarchies, multiple objectives and fuzzy sets", Fuzzy Sets and Systems,  Vol. 1, No. 1, (1978), 57-68.

30.     Saaty, T.L., "Modeling unstructured decision problems—the theory of analytical hierarchies", Mathematics and Computers in Simulation,  Vol. 20, No. 3, (1978), 147-158.

31.     Saaty, T.L., "Decision making with the analytic hierarchy process", International Journal of Services Sciences,  Vol. 1, No. 1, (2008), 83-98.

32.     Ramík, J., "Consistency of pair-wise comparison matrix with fuzzy elements", in IFSA/EUSFLAT Conf. (2009), 98-101.

33.     Ishizaka, A. and Labib, A., "Review of the main developments in the analytic hierarchy process", Expert Systems with Applications,  Vol. 38, No. 11, (2011), 14336-14345. 





International Journal of Engineering
E-mail: office@ije.ir
Web Site: http://www.ije.ir