Abstract




 
   

IJE TRANSACTIONS B: Applications Vol. 29, No. 2 (February 2016) 274-279    Article Under Final Proof

downloaded Downloaded: 135   viewed Viewed: 2340

  ENERGY DELIVERY AT OIL AND GAS WELLS CONSTRUCTION IN REGIONS WITH HARSH CLIMATE
 
V. Morenov and E. Leusheva
 
( Received: November 06, 2015 – Accepted: January 26, 2016 )
 
 

Abstract    Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sources, such as gas turbine units. In this regard efficiency enhancement of power units is seen as relevant task. Thus combined heat and power structure for efficient power supply of well construction operations is offered by the authors. Required amount of electric and heat energy at well drilling in harsh climate is calculated in the paper. Also scheme of energy delivering structure based on gas turbine units with flue gases heat utilization for rig objects heating is developed in the article.

 

Keywords    Combined heat and power, well construction, energy delivery, gas turbine, heat supply, drilling rig, heat losses.

 

چکیده    تامین انرژی در محل های ساخت چاه های نفت و گاز در مناطق با شرایط آب و هوایی دشوار تامین انرژی مورد نیاز ساخت چاه در مناطقی با آب و هوای ناملایم با نیاز به نیروی الکتریکی و گرمایی متمایز می شود. مصرف انرژی در وسایل حفاری، تولید و در امکانات زندگی در طول سال با توجه به شدت تامین نیرو و شرایط آب و هوایی به شدت تغییر می کند. نیرو در مناطق دور دست ساخت چاه معمولا به وسیله منابع مستقل تامین انرژی نظیر توربین های گازی تامین می گردد. در نتیجه افزایش بازدهی واحد های تولید انرژی ضروری می نماید. بدین منظور ساختار ترکیبی گرما و نیرو در جهت تامین بهینه نیروی مورد نیاز عملیات ساخت چاه به وسیله نویسندگان پیشنهاد می گردد. در این مقاله مقدار انرژی گرمایی و الکتریکی مورد نیاز در عملیات حفاری چاه در مناطق با آب و هوای ناملایم محاسبه شده است. همچنین مدل ساختار تامین انرژی بر اساس عملکرد توربین های گازی جهت تامین گرمای ساختارهای دکل توسعه یافته است.

References   

 

1.        Ignatiev M. Energy self-sufficiency is becoming one of the urgent tasks in the industry (Samoenergoobespechenie stanovitsya odnoi iz samih aktualnih otraslevih zadach). Neftegazovaya Vertikal – Oil And Gas Vertical, Vol. 5, (2004), 72-74.

2.        Rybakov B.A., Burov V.D., Rybakov D.B., Trushin K.S. Peculiarities of associated petroleum gas burning in gas turbine units (Osobennosti szhigania popytnogo neftyanogo gaza v gazotyrbinnih ystanovkah). Turbini I Dizeli – Turbines and Diesels, Vol. 5, (2008), 2-8

3.        Limitovsky A. M., Merkulov M. V., Kosyanov V. A. Energy providing of technological consumers at geological prospecting (Energoobespechenie tehnologicheskih potrebitelei geologorazvedochnih rabot). Moscow, «IPC “Maska”» Ltd, (2008), 135

4.        San Martin J.I. Trigeneration systems with fuel cells. Research Paper, retrieved 18 April, (2011), 2-6.

5.        S. Nikbakht Naserabad, K. Mobini, A. Mehrpanahi, M. R. Aligoodarz, Technical Analysis of Conversion of A Steam Power Plant to Combined Cycle, Using Two Types of Heavy Duty Gas Turbines, International Journal of Engineering (IJE), Transactions B: Applications  Vol. 28, No. 5, (2015), 781-793

6.        Boyce M.H. Gas turbine engineering handbook. Elsevier inc., (2012), 993-997.

7.        Leusheva E.L., Morenov V.A. Combined oilfield power supplying system with petroleum gas utilization as an energy carrier (Sistema kompleksnogo ehnergosnabzheniya neftegazopromyslov s ispol'zovaniem neftyanogo gaza v kachestve ehnergonositelya). Neftyanoe Hozyajstvo - Oil Industry, No. 5, (2015),  96-100

8.        Kalinin A. G., Oshkordin O. V., Pitersky V. M., Solovyev N. V. Prospecting drilling (Razvedochnoe byrenie). Мoscow, «Nedra-Biznescentr» Ltd, (2000), 748.

9.        Limitovsky A. M., Markov A. U., Merkulov M. V. Electric and heat supply of geological prospecting (Electro- I teplosnabzhenie geologorazvedochnih rabot). Мoscow, «Nedra», (1988).

10.     M. Ahmadzadehtalatapeh and Y. H. Yau "Fully  Fresh  Air  Air-conditioning  System  Equipped  with  Double  Heat  Pipe Based Heat Recovery Technology", International Journal of Engineering Transactions A: Basics   Vol. 26, No. 1, (2013)  51- 57

11.     M. Ahmadzadehtalatapeh and Y. H. Yau "Energy Conservation Potential of the Heat Pipe Heat Exchangers: Experimental Study and Predictions" / International Journal of Engineering Transactions B: Applications Vol. 25, No. 3, (2012) 193-199

12.     Zh. Cancan, L. Yafei, W. Li, X. Ke, W. Jinxing, Review Heat Exchanger: Research Development of Self-rotating Inserts in Heat Exchanger Tubes, International Journal of Engineering Transactions A: Basics Vol. 27, No. 10, (2014), 1503-1510.

13.     Morenov V.A Utilization of associated petroleum gas as an energy carrier (Primenenie popytnogo neftyanogo gaza v kachestve energonositelya). Naychno-tehnicheskie vedomosti SPBGPU - Scientific Technic News of SPBSPU, No. 2, (2012), 61-65.





International Journal of Engineering
E-mail: office@ije.ir
Web Site: http://www.ije.ir