References
1. Safaeipour, A. and Niaki, S.T.A., "Drift change point estimation in multistage processes using mle", International Journal of Reliability, Quality and Safety Engineering, Vol. 22, No. 05, (2015), 1550025. 2. Sturludottir, E., Gunnlaugsdottir, H., Nielsen, O.K. and Stefansson, G., "Detection of a changepoint, a mean-shift accompanied with a trend change, in short time-series with autocorrelation", Communications in Statistics-Simulation and Computation, Vol. 46, No. 7, (2017), 5808-5818. 3. Slama, A. and Saggou, H., "A bayesian analysis of a change in the parameters of autoregressive time series", Communications in Statistics-Simulation and Computation, Vol. 46, No. 9, (2017), 7008-7021. 4. Bodnar, O., "Application of the generalized likelihood ratio test for detecting changes in the mean of multivariate garch processes", Communications in Statistics-Simulation and Computation, Vol. 38, No. 5, (2009), 919-938. 5. Doroudyan, M., Owlia, M.S., Sadeghi, H. and Amiri, A., "Monitoring financial processes with arma-garch model based on shewhart control chart (case study: Tehran stock exchange)", International Journal of Engineering-Transactions B: Applications, Vol. 30, No. 2, (2017), 270-280. 6. Moghadam, R.P., Shahraki, F. and Sadeghi, J., "Online monitoring for industrial processes quality control using time varying parameter model", International Journal of Engineering-Transactions A: Basics, Vol. 31, No. 4, (2018), 524-532. 7. Keramatpour, M., Niaki, S., Khedmati, M. and Soleymanian, M., "Monitoring and change point estimation of ar (1) autocorrelated polynomial profiles", International Journal of Engineering-Transactions C: Aspects, Vol. 26, No. 9, (2013), 933-942. 8. Vakilian, F., Amiri, A. and Sogandi, F., "Isotonic change point estimation in the ar (1) autocorrelated simple linear profiles", International Journal of Engineering-Transactions A: Basics, Vol. 28, No. 7, (2015), 1059-1067. 9. Li, F., Tian, Z. and Qi, P., "Structural change monitoring for random coefficient autoregressive time series", Communications in Statistics-Simulation and Computation, Vol. 44, No. 4, (2015), 996-1009. 10. Chang, S.I., Zhang, Z., Koppel, S., Malmir, B., Kong, X., Tsai, T.-R. and Wang, D., "Retrospective analysis for phase i statistical process control and process capability study using revised sample entropy", Neural Computing and Applications, (2018), 1-14. 11. Ebadi, M., Shahriari, H., Abdollahzadeh, M. and Bahrini, A., "Robust estimation of parameters in multivariate processes", in 2011 IEEE International Conference on Quality and Reliability, IEEE., (2011), 585-589. 12. Nishina, K., "A comparison of control charts from the viewpoint of change‐point estimation", Quality and reliability engineering international, Vol. 8, No. 6, (1992), 537-541. 13. Page, E.S., "Continuous inspection schemes", Biometrika, Vol. 41, No. 1/2, (1954), 100-115. 14. Atashgar, K. and Noorossana, R., "An integrating approach to root cause analysis of a bivariate mean vector with a linear trend disturbance", The International Journal of Advanced Manufacturing Technology, Vol. 52, No. 1-4, (2011), 407-420. 15. Ahmadzadeh, F., "Change point detection with multivariate control charts by artificial neural network", The International Journal of Advanced Manufacturing Technology, Vol. 97, No. 9-12, (2018), 3179-3190. 16. Noorossana, R., Saghaei, A., Paynabar, K. and Abdi, S., "Identifying the period of a step change in high‐yield processes", Quality and Reliability Engineering International, Vol. 25, No. 7, (2009), 875-883. 17. Pignatiello Jr, J.J. and Samuel, T.R., "Estimation of the change point of a normal process mean in spc applications", Journal of Quality technology, Vol. 33, No. 1, (2001), 82-95. 18. Samuel, T.R., Pignatiello Jr, J.J. and Calvin, J.A., "Identifying the time of a step change with x control charts", Quality Engineering, Vol. 10, No. 3, (1998), 521-527. 19. Samuel, T.R., Pignatiello Jr, J.J. and Calvin, J.A., "Identifying the time of a step change in a normal process variance", Quality Engineering, Vol. 10, No. 3, (1998), 529-538. 20. Daryabari, S.A., Malmir, B. and Amiri, A., "Monitoring bernoulli processes considering measurement errors and learning effect", Quality and Reliability Engineering International, (2019). 21. Perry, M.B., Pignatiello Jr, J.J. and Simpson, J.R., "Estimating the change point of the process fraction non‐conforming with a monotonic change disturbance in spc", Quality and Reliability Engineering International, Vol. 23, No. 3, (2007), 327-339. 22. Noorossana, R. and Shadman, A., "Estimating the change point of a normal process mean with a monotonic change", Quality and Reliability Engineering International, Vol. 25, No. 1, (2009), 79-90. 23. Perry, M.B. and Pignatiello Jr, J.J., "Estimation of the change point of a normal process mean with a linear trend disturbance in spc", Quality Technology & Quantitative Management, Vol. 3, No. 3, (2006), 325-334. 24. Perry, M.B., Pignatiello Jr, J.J. and Simpson, J.R., "Estimating the change point of a poisson rate parameter with a linear trend disturbance", Quality and Reliability Engineering International, Vol. 22, No. 4, (2006), 371-384. 25. Ghazanfari, M., Alaeddini, A., Niaki, S.T.A. and Aryanezhad, M.B., "A clustering approach to identify the time of a step change in shewhart control charts", Quality and Reliability Engineering International, Vol. 24, No. 7, (2008), 765-778. 26. Alaeddini, A., Ghazanfari, M. and Nayeri, M.A., "A hybrid fuzzy-statistical clustering approach for estimating the time of changes in fixed and variable sampling control charts", Information Sciences, Vol. 179, No. 11, (2009), 1769-1784. 27. Amiri, A. and Allahyari, S., "Change point estimation methods for control chart postsignal diagnostics: A literature review", Quality and Reliability Engineering International, Vol. 28, No. 7, (2012), 673-685. 28. Kazemzadeh, R.B., Noorossana, R. and Ayoubi, M., "Change point estimation of multivariate linear profiles under linear drift", Communications in Statistics-Simulation and Computation, Vol. 44, No. 6, (2015), 1570-1599. 29. Doǧu, E. and Kocakoç, İ.D., "Estimation of change point in generalized variance control chart", Communications in Statistics—Simulation and Computation®, Vol. 40, No. 3, (2011), 345-363. 30. Lee, J. and Park, C., "Estimation of the change point in monitoring the process mean and variance", Communications in Statistics—Simulation and Computation®, Vol. 36, No. 6, (2007), 1333-1345. 31. Chang, S.T. and Lu, K.P., "Change‐point detection for shifts in control charts using em change‐point algorithms", Quality and Reliability Engineering International, Vol. 32, No. 3, (2016), 889-900. 32. Asghari Torkamani, E., Niaki, S.T.A., Aminnayeri, M. and Davoodi, M., "Estimating the change point of correlated poisson count processes", Quality Engineering, Vol. 26, No. 2, (2014), 182-195. 33. Ayoubi, M., Kazemzadeh, R., Niaki, S. and Amiri, A., Change point estimation of a multivariate normal process mean using dynamic linear model. 2014, Submitted. 34. Ayoubi, M., Kazemzadeh, R.B. and Noorossana, R., "Change point estimation in the mean of multivariate linear profiles with no change type assumption via dynamic linear model", Quality and Reliability Engineering International, Vol. 32, No. 2, (2016), 403-433. 35. Ayoubi, M., Kazemzadeh, R. and Noorossana, R., "Estimating multivariate linear profiles change point with a monotonic change in the mean of response variables", The International Journal of Advanced Manufacturing Technology, Vol. 75, No. 9-12, (2014), 1537-1556. 36. Sheikhrabori, R., Aminnayeri, M. and Ayoubi, M., "Maximum likelihood estimation of change point from stationary to nonstationary in autoregressive models using dynamic linear model", Quality and Reliability Engineering International, Vol. 34, No. 1, (2018), 27-36. 37. Ashuri, A. and Amiri, A., "Drift change point estimation in autocorrelated poisson count processes using mle approach", International Journal of Engineering, Vol. 28, No. 7, (2015), 1021-1030. 38. Hawkins, D.M. and Zamba, K., "A change-point model for a shift in variance", Journal of Quality technology, Vol. 37, No. 1, (2005), 21-31. 39. Malela‐Majika, J.C. and Rapoo, E., "Distribution‐free mixed cumulative sum‐exponentially weighted moving average control charts for detecting mean shifts", Quality and Reliability Engineering International, Vol. 33, No. 8, (2017), 1983-2002. 40. Amiri, A. and Zolfaghari, S., "Estimation of change point in two-stage processes subject to step change and linear trend", International Journal of Reliability, Quality and Safety Engineering, Vol. 23, No. 02, (2016), 1650007. 41. Daryabari, S.A., Hashemian, S.M., Keyvandarian, A. and Maryam, S.A., "The effects of measurement error on the max ewmams control chart", Communications in Statistics-Theory and Methods, Vol. 46, No. 12, (2017), 5766-5778. 42. Lu, K.-P., Chang, S.-T. and Yang, M.-S., "Change-point detection for shifts in control charts using fuzzy shift change-point algorithms", Computers & Industrial Engineering, Vol. 93, No., (2016), 12-27. 43. Jiang, W., Tsui, K.-L. and Woodall, W.H., "A new spc monitoring method: The arma chart", Technometrics, Vol. 42, No. 4, (2000), 399-410. 44. Tsay, R.S. and Tiao, G.C., "Consistent estimates of autoregressive parameters and extended sample autocorrelation function for stationary and nonstationary arma models", Journal of the American Statistical Association, Vol. 79, No. 385, (1984), 84-96. 45. Shao, Q. and Yang, L., "Oracally efficient estimation and consistent model selection for auto‐regressive moving average time series with trend", Journal of the Royal Statistical Society: Series B (Statistical Methodology), Vol. 79, No. 2, (2017), 507-524. 46. Ghanbarzadeh, M. and Aminghafari, M., "A new hybrid-multiscale ssa prediction of non-stationary time series", Fluctuation and Noise Letters, Vol. 15, No. 01, (2016), 1650005. 47. Montgomery, D.C., "Introduction to statistical quality control, John Wiley & Sons, (2007). 48. Petris G, Petrone S and P, C., "Dynamic linear models with r. , New York, Springer-Verlag, (2007). 49. Meinhold, R.J. and Singpurwalla, N.D., "Understanding the kalman filter", The American Statistician, Vol. 37, No. 2, (1983), 123-127. 50. Zhang, Y. and Li, X., "Fixed-interval smoothing algorithm based on singular value decomposition", in Control Applications, 1996., Proceedings of the 1996 IEEE International Conference on, IEEE., (1996), 916-921. 51. Wang, L., Libert, G. and Manneback, P., "Kalman filter algorithm based on singular value decomposition", in Decision and Control, 1992., Proceedings of the 31st IEEE Conference on, IEEE., (1992), 1224-1229. 52. Francq, C., Roy, R. and Zakoďan, J.-M., "Diagnostic checking in arma models with uncorrelated errors", Journal of the American Statistical Association, Vol. 100, No. 470, (2005), 532-544.
|